Civil Engineering Projects -
Stormwater
|
|
Client
City of Groveland
______
Location
Groveland, Florida
__________
Key BCI Staff
Walter Reigner, PE, CPESC
Terry Dykehouse, PE
Terese Gregg, EI
Jeff Leahy
______
Project Costs
Engineering Survey: $60,000
Construction: $500,000
______
Start Date
June 2006
______
Completion Date
Ongoing
|
Lake David
Stormwater Improvements
|
|
Scope
The City of Groveland hired BCI to design French drains as a retrofit to improve the water quality of discharges to Lake David from an existing drainage system in a commercial/residential area within the City. The project is funded through the Lake County Water Authority as part of the Stormwater Master Plan, also developed for the City by BCI.
Lake David is the focal point for the City, as it is adjacent to one of the City’s parks and provides a venue for a number of annual festive occasions. The water quality of the Lake is of great importance to residents.
Key project elements include:
-
Design & permitting for 650 feet of French drains
-
Design of outfall improvements
-
Design of sidewalks & intersection improvements
-
Specifications of skimmer baskets in new inlets
-
Pollutant load removal estimates
-
Preparation of bid documents
-
Conducting pre-bid and pre-construction meetings
-
Construction inspections
-
Submittal review

|
|