Civil Engineering Projects -
Government/Municipal/Redevelopment
|
|
Client
Polk County
______
Location
Polk County, Florida
______
Key BCI Staff
Walter Reigner, PE, CPESC
Timothy Kelly, PE
Stephen Hjelle, PEÂ
______
Project Costs
$280,000
______
Start Date
1998
______
Completion Date
2002
|
Transportation Engineering
Consulting Services
|
|
Scope
BCI has completed a variety of intersection improvement projects for Polk County while performing transportation consulting services.
Those projects include:
-
SR 655 & Coleman Road Intersection
BCI added a turn lane, revised signalization, eliminated deep roadside ditches, and designed a closed conveyance system to maintain existing right-of-way.
-
CR 542 & Dixie Highway Intersection
BCI added signalization and left turn lanes and closed the drainage system to maintain existing right-of-way.
-
Bridges & Bennet Intersection
BCI revised a five-way intersection into a four-way and three-way intersection to improve traffic flow safety.
-
SR 655 & Summerset Intersection
Left turn lanes were added on SR 655 into a subdivision.
-
Buckeye Road & Buckeye Loop Intersection
BCI added a left turn lane on each road.
BCI also completed the following comprehensive improvements:
-
Geotechnical investigation of roadway improvements including soil borings for pavements, drainage swales and mast arm foundations
-
Topographical survey and right-of-way control mapping
-
Roadway plans, drainage plans, signing and marking plans, and traffic control plans
-
Replaced open ditches with swales and ditch bottom inlets
-
Added left turn lanes and widened all travel lanes to 12 feet
-
Redesigned storm sewer system to accept flows from new intersection configuration
-
Redesigned intersection containing third diagonal street by dividing into two intersections
-
Prepared utility adjustment plans
-
Obtained drainage permits from Southwest Florida Water Management District
|
|