Water Resources Projects -
Ecorestoration
|
|
Client
Suwannee River Water Management District
______
Location
Bradford County, Florida
______
Key BCI Staff
John Kiefer, PE, PWS
Thad Ellington
______
Project Costs
Engineering: $20,000 Construction: $4 million
______
Start Date
September 2005
______
Completion Date
Ongoing
|
Alligator Creek
Canal Restoration
|
|
Scope
Alligator Creek is actually a 40-foot wide, 15-foot deep canal cut through the City of Starke and outlying areas through a former stream and floodplain system that discharges to Lake Rowell. The District retained BCI's services to help restore this system to a more naturally functional stream and to stabilize its failing banks.
BCI's services included:
-
Stream assessment using a Channel Evolution Model
-
Preliminary natural channel design
-
Preliminary bank stabilization design
-
GIS mapping
-
Construction cost estimates
-
Public presentations and support materials
|
|